Case Study

    Aparthotel Practical Completion & Sleeping Accommodation

    Pre-opening fire risk assessment for a multi-storey aparthotel/sleeping accommodation premises at practical-completion stage.

    Illuminated fire exit sign and lift/stairs wayfinding in an aparthotel escape route

    Summary

    Fire Check Scotland assessed a newly refurbished aparthotel-style sleeping accommodation premises shortly before opening. The building included guest apartments, internal escape routes, alarm and detection, smoke-control/AOV provision, sprinkler/suppression features, fire doors, service risers, management handover requirements and guest fire-safety arrangements.

    The client needed a practical-completion fire risk assessment that would identify the fire-safety handover evidence and management arrangements required before occupation.

    The Premises

    • Multi-storey aparthotel / sleeping accommodation premises.
    • Guest apartments and shared escape routes.
    • Pre-opening / practical-completion stage.
    • Fire alarm and automatic detection.
    • Smoke-control/AOV and suppression/sprinkler-related evidence.
    • Fire-door and compartmentation features.
    • Service risers, plant areas and management areas.
    • Guest fire action notices and staff/keyholder arrangements required.

    Why This Project Was More Complex

    Sleeping accommodation creates higher consequence because guests may be asleep, unfamiliar with the building and dependent on the installed fire safety systems and clear management procedures. Practical-completion status adds a further layer: systems may be installed, but the responsible person still needs commissioning evidence, handover records, cause-and-effect, maintenance arrangements and staff/keyholder procedures.

    The assessment therefore had to consider both physical precautions and whether the management system was ready for occupation.

    Key Technical Themes

    • Final occupancy/accommodation schedule to be confirmed.
    • Approved fire strategy/building standards fire-safety package to be retained.
    • Fire alarm handover, monitoring, zone plan, device schedule and cause-and-effect evidence.
    • AOV/smoke-control commissioning, interface testing and reset procedures.
    • Sprinkler/suppression design, maintenance and alarm-interface records.
    • Fire-door, fire-stopping and compartmentation schedules and close-out evidence.
    • Access-control release and cause-and-effect testing.
    • Guest fire action notices, evacuation strategy and route information.
    • Keyholder, maintenance, out-of-hours response and staff training arrangements.
    • Assisted evacuation/refuge arrangements and emergency voice communication testing.
    • Fire blankets/extinguishers, kitchenette controls and housekeeping.
    • Close-out of pre-opening snagging affecting escape routes or fire precautions.

    Fire Check Scotland Approach

    The report treated the premises as an almost-complete building that still required documented close-out before occupation. It avoided presenting installed equipment as fully evidenced until commissioning, maintenance and handover records had been provided.

    The action plan was structured around practical-completion priorities: what had to be confirmed before opening, what needed to be retained in the fire-safety file, and what management procedures had to be finalised before guests occupied the building.

    Outcome

    The client received a clear pre-opening action plan suitable for coordinating the project team, contractors and management team. The report identified the life-safety documents and procedures required for handover and ongoing management of sleeping accommodation.

    Relevance to Similar Clients

    This experience is relevant to hotels, aparthotels, serviced apartments, short-term-let portfolios, student accommodation and other sleeping accommodation premises at refurbishment, conversion, practical-completion or pre-opening stage.

    This case study is anonymised. The client name, exact address, named individuals and identifying details have been removed or generalised.